The work was really fast during this phase. A truck was outside and loaded with all the removals.  Carpeting revealed a stable flooring for the cork tile we wanted.  The only stumble was the breaking of the Master Bath toilet which Gaspars replaced. 

All the tiling in the shower, bathtub, floor, and walls were gone quickly leaving the bathroom ready for the next phase:  Construction.

Finally, the guest bedroom was cleared, floor removed and closet made ready for the widening with a beam inserted in case a door was ever wanted.